What are the 5 major tests for building piping system

Sep. 13, 2021
① Pressure test (pressure-bearing pipeline)
The pipeline pressure test shall be carried out after the installation of the pipeline system is completed, the appearance inspection is qualified, the pipeline is firmly fixed, the non-destructive test and the heat treatment are qualified, and the pipeline is no longer open or welded.
1) The test pressure should be carried out in accordance with the design requirements. When the design does not indicate the test pressure, it should be carried out in accordance with the specifications. The test pressure of the water supply piping system of various materials is 1.5 times the working pressure, but not less than 0.6MP; the metal and composite pipe water supply piping system is observed under the test pressure for 10 minutes, the pressure drop should not be greater than 0.02MP, and then drop to the working pressure During inspection, there should be no leakage; the plastic water supply system should be stabilized under the test pressure for 1h, the pressure drop shall not exceed 0.05MP, and then at 1.15 times the working pressure, the pressure shall be stabilized for 2h, and the pressure drop shall not exceed 0.03MP. At the same time, check No leakage at each connection.
2) The pressure test should be hydraulic test and a special plan should be prepared. When a pneumatic test is required, the designer's approval should be obtained.
3) High-rise and super-high-rise building pipelines should be tested according to partitions and sections first, and then the overall test according to the system after passing the test.
② Irrigation test (non-pressure-bearing pipeline)
1) Indoor concealed or buried drainage pipes must be irrigated before being concealed, and the irrigation height should not be lower than the upper edge of the sanitary ware at the bottom or the height of the ground at the bottom. Fill it with water for 15 minutes, and then fill it for 5 minutes after the water level drops. If the liquid level does not drop, and there is no leakage in the pipes and joints, it is qualified.
2) The outdoor drainage pipe network shall be tested in sections according to the drainage inspection wells. The test head shall be added 1m from the top of the upstream pipe of the test section for no less than 30min. Observe section by section. No leakage at the pipe joint is qualified.
?3) Indoor rainwater pipes should be filled with whole section or segmented methods according to the pipe material and the height of the building. The irrigation height of the whole test should reach the rainwater bucket on the upper part of the riser. When the irrigation reaches a stable water surface, observe for 1 hour, and the pipeline is qualified if there is no leakage.
③ Through the ball test (drain main pipe)
After the installation of the main riser and horizontal main pipe of the drainage pipe, a ball pass test should be done. The ball diameter should not be less than 2/3 of the diameter of the drain pipe, and the ball pass rate must reach 100%.
④ Water test (drainage main pipe)
After the drainage system is installed, the drainage pipes and rainwater pipes should be subjected to water-passing tests in separate systems, and the water should be smooth, non-leaking, and qualified.
[Note] The purpose of the irrigation test, ball passing test, and water passing test for drainage pipes are: check for leakage, check for blockage, and check for patency.
⑤ Fire hydrant test firing test
1) The indoor fire hydrant system must be tested after installation. The test firing test generally takes three representative places: one place on the roof (or in the water tank room) and two places on the first floor.
2) The fire hydrant for roof test can be used to test the water flow and pressure of the fire hydrant (substantiated water column); two fire hydrants on the first floor can be tested to test the ability of two full water columns to reach the farthest point at the same time.
If you are interested in piping system,You can browse related products and initiate consultations on our website.
返回頂部
CLOSE
主站蜘蛛池模板: 国产91av在线 | 亚洲欧洲日产国码无码久久99 | 国产福利资源在线 | 久久99精品久久久久久琪琪 | 久久久久人妻一区精品性色AV | 国产v欧美Ⅴ日韩v在线观看 | 懂色av一区二区三区观看 | 日韩成人极品在线内射3p蜜臀 | 成人午夜精品久久久久久久 | 日本又色又爽又黄的a片中文字幕 | 国产超碰人人模人人爽人人添 | 欧美性生交大片免费看A片免费 | 国产精品爱久久久久久久 | 欧美巨大XXXX做受中文字幕 | 久久久久美女 | 亚洲AV永久无码精品天堂动漫 | 中文字幕精品视频在线 | av影片免费在线观看 | 我要看黄色a级片 | 久久久久久久久久久久久久久伊免 | 午夜精品一区二区久久做 | 国产免费一区二区三区在线网站 | 激情欲成人av在线观看av | 黄色大片免费观看视频 | 日本黄色不卡 | 2017亚洲天堂最新地址 | 97国产精华最好的产品亚洲 | 性中国熟妇videofreesexwww | 久久高清亚洲 | 免费国产福利 | 午夜无人区免费网站 | 麻豆精品福利 | 久久东京 | 国产精品久久久久久久稀缺资源 | 日韩国产高清一区二区 | 国产高潮流白浆啊免费A片动态 | 大陆一级毛片免费看 | 日韩久久久久久久久久 | 久草在线青青草 | 国产伦精品一区二区三区视频金莲 | 国产无套露脸视频在线观看 |