三区一级_97欧美一乱一性一交一视频_精品国产一区二区三区久久久樱花_久久久99国产精品免费_国产精品午夜福利_国产大屁股喷水视频在线观看

CLOSE

Precautions for ppr pipe during installation of pipe fittings.

Mar. 20, 2021
What are the precautions for ppr pipe in the process of pipe fittings installation?

The normal use of ppr pipe fittings is inseparable from the correct and standardized installation. As a professional ppr pipe fitting manufacturer, ppr pipe manufacturers need to better regulate their own installation technology. First fix the wiring, and then slot into the ground. I think it’s better to let the plumber do it. After all, the plumber’s staff are more professional, so it won’t be great if the water pipes you connect to it leaks.

From the connection of PPR pipes: hot-melt connection. The melting temperature is 260 degrees. Your installation scale should refer to your design scale. This has to be designed according to your home improvement. Generally, PPR cannot be exposed to the surface. The first surface-mounted PPR will be deformed by gravity, and the second surface-mounted PPR will easily age. Third, if it is a white PPR, it can easily transmit light to form breeding bacteria. So it is recommended to bury it in secret. PPR water pipes can also be connected by hot-melt sockets. The pipes and pipe fittings are completely integrated, and the strength of the joints even exceeds the strength of the pipe body. As long as the construction is properly performed, it will pass the pressure test after completion, and the performance is extremely high.

Precautions for ppr pipe during installation of pipe fittings:

?1. The pressure test can be more than 30 minutes. If the site environment permits, the pressure test time can be longer.

?2. The purchase of ppr pipes and fittings must be guaranteed and must be operated by professionally trained technical workers.

?3. According to the horizontal, horizontal and vertical principle, a deep groove larger than the diameter of the water pipe should be grooved on the basic floor of the room, and then ppr pipe fittings should be laid, followed by sequential hot-melt connection. The process flow is very important.

4. After all ppr pipe fittings are fused together with hot melt technology, the necessary pressure strength test is carried out.

?5. The hot-melt technology is finalized after cooling. It is not that the longer the time, the better. Long-term pressure will damage the water pipe. When it is ensured that there is no leakage of water, then landfill is carried out.

Special attention should be paid to the appearance of ppr pipe welding, and non-destructive testing can only be carried out after the appearance inspection is qualified. Radiographic flaw detection shall be carried out on pipe welds that cross rivers, reservoirs, roads, railways, underground pipelines, cables, and optical cables, welds between straight pipes and elbows, and joints after pressure test.
返回頂部
CLOSE
主站蜘蛛池模板: 久久久久人妻综合免费无码 | 国产成人精品999在线观看 | 日韩亚洲在线视频 | 满天神佛国语免费观看 | 成人深夜视频在线观看 | 少妇淫片免费看 | 超碰96 | 久久综合给合久久狠狠狠97色 | 欧美精品高清在线观看 | 一本到国产在线精品国内 | 人人爽久久涩噜噜噜丁香 | 一级毛片999| 日本a级片免费 | 美女视频黄又黄又免费 | 久久国产精品_国产精品 | 亚洲熟妇无码一区二区三区导航 | 久久艹精品视频 | 乱码午夜极品国产内射 | 欧美第一区第二区 | 被黑人各种姿势猛烈进出视频 | 一级做a爰片欧美激情床 | 亚洲网站在线观看视频 | 91亚洲国产成人精品性色 | 亚洲色无色A片一区二区农夫 | 欧美日韩在线高清 | 免费精品一区二区三区A片在线 | 亚洲成A人片在线观看中文无码 | 苍井空毛片精品久久久 | 欧美国产伦久久久久久久 | 国产精品沙发系列 | av片网站在线观看 | 精品一区二区视频在线 | 日韩五码在线观看 | 少妇下蹲露大唇无遮挡 | 午夜在线一区二区 | 91麻豆精品国产片在线观看 | 好紧好滑好湿好爽免费视频 | 在线这里只有精品 | 免费看裸体美女脱了衣服露视频胸 | 国产精品亚洲а∨无码播放不卡 | 国产日产欧洲无码视频无遮挡 |